Outdoor Dining Decks Removal, Street Closures, and Cleaning
The temporary outdoor dining decks that were installed by City of Roseville last year are scheduled to be removed in the Downtown Roseville area according to the following schedule:
November 8th, DAY 1: Vernon Street
Street closure: Monday, November 8, 4 a.m. - 3 p.m.
- Vernon Street between Lincoln and Taylor Street
- S. Grant Street between Atlantic and Oak Street
- K-rail will start to be removed and demo contractor will begin at 7:00am
- All k-rail and decks will be removed from Vernon (5 on 200 block, 1 on 400 block)
November 9th, DAY 2: Old Town
Street closure: Tuesday, November 9, 5 a.m. - 3 p.m.
- Church Street between Washington and Lincoln Street
- K-rail will be removed and demo contractor will start at 7 am
- K-rail and deck will be removed
November 10th (early morning):
The leaf blowing contractor will blow and remove leaves and debris from Vernon Street.